This is a free-standing kitchen and will have a stove, oven, fridge and a 3-sink unit placed in the kitchen counter.  We spoke to the electrician today and will have electricity in 2 weeks.


kitchen2

Side View


front

Front View


interior2

These are metal cabinets for critter-control and there’s the 3-sink unit. Obviously, nothing has been finished inside.  We just completed the structure and painted the trim today.


interior

A view of front door and window


back kitchen

A back view


kitchen 7

Looking out back window over sink


kitchen5

Another side view


kitchen3

A side view from path

Lots of progress has been made.  Just need to finish the interior and get water, propane and electric hooked up.  We are on our way!